###
DOI:
上海电力大学学报:1997,13(3):40-45
本文二维码信息
码上扫一扫!
300MW机组直吹式制粉系统风量调节的研究
(1.上海电力学院;2.嘉兴发电厂)
Reasearch on Air-rate Adjustment in Direct Pulverizing System of 300 MW Unit
(1.Shanghai Institute of Electric Power;2.Jiaxing Power Plant)
摘要
图/表
参考文献
本刊相似文献
All Journals 相似文献
All Journals 引证文献
本文已被:浏览 729次   下载 559
投稿时间:1997-07-15    
中文摘要: 国产引进型300MW机组直吹式制粉系统运行中存在风量难以调节的问题,本文研究发现其原因是热风道阻力远大于冷风道阻力及风量测量装置选用不当,并提出了相应的改进措施.实践表明改进措施是合理的。
Abstract:This paper studies the problems existing in air-rate adjustment in direct pulverizing system of 300 MW brought-in unit. It is concluded that air-rate is difficult to adjust for the reason that flow resistance in hot air-duct is larger than that in cold air-duct, and that the choice of the equipment measuring air-rate is incorrectly made. Based on the analysis, this paper presents a method for improvement. The method have proved workable in production.
文章编号:19970307     中图分类号:    文献标志码:
基金项目:
引用文本:
沈坤全,史剑戟,潘志强,等.300MW机组直吹式制粉系统风量调节的研究[J].上海电力大学学报,1997,13(3):40-45.
Shen Kunquan,Shi Jianjie,Pan Zhiqiang,et al.Reasearch on Air-rate Adjustment in Direct Pulverizing System of 300 MW Unit[J].Journal of Shanghai University of Electric Power,1997,13(3):40-45.