中文摘要: 针对火电厂辅助程控系统Y2K问题的现状,提出对Y2K问题不能抓大放“小”,应对所有利用微处理器技术的辅助程控系统逐一进行分析和测试.通过对某电厂300MW机组锅炉吹灰程控系统所作的评估和测试,指出了查处辅助程控系统Y2K问题的基本方法.
Abstract:In view of the existing situation of the Y2K problem of power plant's supplementary program control system, this paper presents that Y2K problem can't be treated by stressing big system and ignoring small one, and all supplementary program control system using CPU must be analyzed and tested one by one. Taking the analysis and test of the boiler cleaning program control system of a power plant's 300 MW turbo-alternator as an example, the pa-per describes the basic way of checking the Y2K problem of supplementary program controlsystem.
keywords: supplementary program control system Y2K analysis test
文章编号:19990205 中图分类号: 文献标志码:
基金项目:
引用文本:
黄伟,钱虹,鲍克勤,等.火电厂辅助程控系统中的Y2K问题[J].上海电力大学学报,1999,15(2):29-34.
Huang Wei,Qian Hong,Bao Keqing,et al.Y2K Problem of Power Plant's Supplementary Program Control System[J].Journal of Shanghai University of Electric Power,1999,15(2):29-34.
黄伟,钱虹,鲍克勤,等.火电厂辅助程控系统中的Y2K问题[J].上海电力大学学报,1999,15(2):29-34.
Huang Wei,Qian Hong,Bao Keqing,et al.Y2K Problem of Power Plant's Supplementary Program Control System[J].Journal of Shanghai University of Electric Power,1999,15(2):29-34.