中文摘要: 通过对某沿海电厂除盐系统不能正常运行的分析,提出了在除盐装置之前串接反渗透装置的设想,并经过技术经济比较,确定部分原水通过RO处理后进入除盐系统的技改方案,使除盐系统能够满足原水水质大幅度变化的要求。
Abstract:Through the analysis of the case that the demineralization system of a coastal power plant can't be operated in normal condition, an assumption is presented that a reverse osmosis installation in a serial arrangement should be designed upstream. After technical and economic analysis of the scheme, a technical renovation proposal is presented that partial raw water should flow into the demineralization system after the RO treatment so that the system can follow the great variation of raw water quality
文章编号:20010109 中图分类号: 文献标志码:
基金项目:
Author Name | Affiliation |
WANG Wei-bin | Zhejang Electric Power Designing Institute, Hangzhou 310007, China |
CHEN Ying | Zhejang Electric Power Designing Institute, Hangzhou 310007, China |
引用文本:
王卫斌,陈颖.沿海电厂水处理反渗透系统与除盐系统的配置[J].上海电力大学学报,2001,17(1):35-38.
WANG Wei-bin,CHEN Ying.Installation of Reverse Osmosis and Demineralization Systems in Coastal Power Plant[J].Journal of Shanghai University of Electric Power,2001,17(1):35-38.
王卫斌,陈颖.沿海电厂水处理反渗透系统与除盐系统的配置[J].上海电力大学学报,2001,17(1):35-38.
WANG Wei-bin,CHEN Ying.Installation of Reverse Osmosis and Demineralization Systems in Coastal Power Plant[J].Journal of Shanghai University of Electric Power,2001,17(1):35-38.