本文已被:浏览 740次 下载 523次
投稿时间:2005-08-02
投稿时间:2005-08-02
中文摘要: 对220 t/h燃油锅炉在改烧水煤浆燃烧调整试验中发现的主要问题的原因进行分析,并提出了改进措施.通过综合治理前后运行情况比较,得出了燃油锅炉改烧水煤浆已获成功的结论.
Abstract:The paper analyzes the problems in the adjustment of converting the 220 t/h oil boiler to water-coal combustion.Through comparsion of the conditions before and after the comprehensive treatment,it concludes that the conversion project has achieved its success.
keywords: water-coal combustion adjustment existing problems analysis of problems measures for treatment
文章编号:20050306 中图分类号: 文献标志码:
基金项目:
Author Name | Affiliation |
CHEN Xu-dong | Wanfeng Thermal Power Co. Ltd., Shantou Special Economic Zone, Shantou 515064, China |
引用文本:
陈旭东.220t/h燃油锅炉改烧水煤浆存在的主要问题及改进措施[J].上海电力大学学报,2005,21(3):221-224.
CHEN Xu-dong.Problems of Converting the 220 t/h Oil Boiler to Water-coal Combustion and Their Solutions[J].Journal of Shanghai University of Electric Power,2005,21(3):221-224.
陈旭东.220t/h燃油锅炉改烧水煤浆存在的主要问题及改进措施[J].上海电力大学学报,2005,21(3):221-224.
CHEN Xu-dong.Problems of Converting the 220 t/h Oil Boiler to Water-coal Combustion and Their Solutions[J].Journal of Shanghai University of Electric Power,2005,21(3):221-224.