本文已被:浏览 923次 下载 507次
投稿时间:2005-10-19
投稿时间:2005-10-19
中文摘要: 分析了蚌埠地区拟建天然气热电联产系统在采暖运行中的困难,以及调峰运行方式的提出和参加电力调峰的途径等问题,并对热电联产系统的3种运行工况的特点、机组运行的要求、发电效率的影响等进行了探讨.
Abstract:The paper analyzes the difficulties in heating operation of the planned heath-power combined production in the City of Bengbu,proposing the way of peak-gap operation,and way of joining the peak-gap system.Such problems as the characteristics of three operational conditions of heat-power combined production,the requirements of generation units,as well as effect on produc-tion efficiency,are also explored.
文章编号:20060109 中图分类号: 文献标志码:
基金项目:
作者 | 单位 |
康家甦 | 蚌埠市新城综合开发区管委会, 安徽 蚌埠 233010 |
Author Name | Affiliation |
KANG Jia-su | Administrative Committee of Xincheng General Development, Bengbu 233010, China |
引用文本:
康家甦.天然气热电联产采暖运行方式可行性探讨[J].上海电力大学学报,2006,22(1):33-35,47.
KANG Jia-su.On the Feasibility of Heating Operation of Heat-Power Combined Production[J].Journal of Shanghai University of Electric Power,2006,22(1):33-35,47.
康家甦.天然气热电联产采暖运行方式可行性探讨[J].上海电力大学学报,2006,22(1):33-35,47.
KANG Jia-su.On the Feasibility of Heating Operation of Heat-Power Combined Production[J].Journal of Shanghai University of Electric Power,2006,22(1):33-35,47.