中文摘要: 分析了龙海地区农村配电变压器计量装置存在的问题,对由此产生的电量损失进行了计算;分析了计量装置故障原因,提出了完善农村配电变压器计量装置的措施,并对改造后的农村配电变压器计量装置进行跟踪调查以说明改造效果.
Abstract:The problems of the metering device of the distribution transformer in Longhai rural district are analyzed,and the electric quantity lost caused by those problems calculated.The reasons of the metering device's faults are surveyed and analysed,and proposals to improve the rural distribution transformer metering device are put forward.The effects are also tracked.
keywords: distribution transformer metering device three-phase four-line watt-hour meter current transformer single-phase watt-hour meter
文章编号:20070403 中图分类号: 文献标志码:
基金项目:
Author Name | Affiliation |
CHEN Yu-hua | Longhai Power Supply Co. Ltd., Zhangzhou 313600, China |
REN Guo-qiang | Tianjin Huashi Science and Technology Co. Ltd., Tianjin 300191, China |
引用文本:
陈裕华,任国强.龙海地区农村配电变压器计量装置的完善[J].上海电力大学学报,2007,23(4):320-322.
CHEN Yu-hua,REN Guo-qiang.Improvement of Distribution Transformer Metering Device in Longhai Rural District[J].Journal of Shanghai University of Electric Power,2007,23(4):320-322.
陈裕华,任国强.龙海地区农村配电变压器计量装置的完善[J].上海电力大学学报,2007,23(4):320-322.
CHEN Yu-hua,REN Guo-qiang.Improvement of Distribution Transformer Metering Device in Longhai Rural District[J].Journal of Shanghai University of Electric Power,2007,23(4):320-322.