中文摘要: 为了比较新建660 MW机组一次与二次再热机型优劣,以安徽某电厂二期扩建工程2×660 MW机组为对象,拟定方案1与方案2。通过技术经济性比较发现,方案1较方案2的总投资虽高约38 201万元,静态投资回收期为10.3a,但节煤效果更好,全厂每年可节约标煤约5.4万t(按假定的负荷模式运行),并减少二氧化碳排放约7万t。
Abstract:In order to compare the advantages and disadvantages of primary reheat model and secondary reheat model of newly-built 660 MW Unit,targeting at 2×660 MW Unit of a power plant in Anhui,scheme 1 and scheme 2 are proposed.Through technical and economic comparison,the total investment of scheme 1 is about 382.01 million yuan higher than that of scheme 2,and the static investment payback period is 10.3 years,but the coal saving effect of scheme 1 is better.The whole plant can save about 54 000 of standard coal every year (according to the assumed load mode) and reduce carbon dioxide emission by about 70 000 t.
文章编号:20223016 中图分类号:TK262 文献标志码:
基金项目:
作者 | 单位 | |
吴志祥 | 国能神皖安庆发电有限责任公司 | 791945126@qq.com |
Author Name | Affiliation | |
WU Zhixiang | Anqing Shenwan Power Generation Co., Ltd., Anqing, Anhui 246000, China | 791945126@qq.com |
引用文本:
吴志祥.660 MW机组主机技术路线优化的技术经济性分析[J].上海电力大学学报,2022,38(3):303-306.
WU Zhixiang.Technical and Economic Analysis of 660 MW Unit Main Engine Technical Route Optimization Project[J].Journal of Shanghai University of Electric Power,2022,38(3):303-306.
吴志祥.660 MW机组主机技术路线优化的技术经济性分析[J].上海电力大学学报,2022,38(3):303-306.
WU Zhixiang.Technical and Economic Analysis of 660 MW Unit Main Engine Technical Route Optimization Project[J].Journal of Shanghai University of Electric Power,2022,38(3):303-306.