中文摘要: 通过水处理中活性炭床滤速试验,验证了吸附水中有机物活性炭床流速不应大于10m/h,吸附水中余氯的活性炭床流速可小于20m/h.与现行的DL/T5068—1996火力发电厂化学设计技术规程的规定相符合.
Abstract:Filter speed experiments of activited carbon bed in water treatment show that the flow speed of activited carbon of organic matter in absorbed water should be less than 10m/h.and that of residual chlonine in absorbed water should be less than 20m/h.It accords with the existing formula of electric power plant's chemistry design technique order DL/T5068-1996.
文章编号:20000114 中图分类号: 文献标志码:
基金项目:
Author Name | Affiliation |
Yin Tielu | Shanghai Lianshen Electric Power Factory |
Wen Renqin | Shanghai Institute of Electric Power |
Ding Huanru | Shanghai Institute of Electric Power |
引用文本:
尹铁路,闻人勤,丁桓如.水处理中活性炭床滤速的试验研究[J].上海电力大学学报,2000,16(1):71-74.
Yin Tielu,Wen Renqin,Ding Huanru.Discussion on Filter Speed Experiment of Activited Carbon Bed in Water Treatment[J].Journal of Shanghai University of Electric Power,2000,16(1):71-74.
尹铁路,闻人勤,丁桓如.水处理中活性炭床滤速的试验研究[J].上海电力大学学报,2000,16(1):71-74.
Yin Tielu,Wen Renqin,Ding Huanru.Discussion on Filter Speed Experiment of Activited Carbon Bed in Water Treatment[J].Journal of Shanghai University of Electric Power,2000,16(1):71-74.