中文摘要: 分析了机组DCS负荷的分布,对DCS资源进行优化,降低了各子系统负荷,并把部分就地控制改为DCS控制,提高了机组的自动化水平和运行可靠性.
Abstract:This paper analyzes the load distributing of DCS for units. Based on this, every subsystem's lo ad is reduced by optimizing the DCS resource.The mode of control of some equipments has been changed from local to DCS. Thus the roboticized level and running reliability have both been improved for generationg units.
keywords: disperse control system resource control
文章编号:20040203 中图分类号: 文献标志码:
基金项目:
引用文本:
胡伯勇,马晖,朱志辉.300MW机组DCS资源优化研究及应用[J].上海电力大学学报,2004,20(2):11-14.
HU Bo-yong,MA Hui,ZHU Zhi-hui.Rearch and Application of DCS of 300 MW Units[J].Journal of Shanghai University of Electric Power,2004,20(2):11-14.