本文已被:浏览 2057次 下载 713次
投稿时间:2003-11-07
投稿时间:2003-11-07
中文摘要: 在工业工程中,生产线平衡率是衡量生产线各工序作业时间平均化状况以及生产线生产效率的指标.FOG活动是解决平衡生产线问题的有效手段.以KC6凸轮轴生产线开展FOG活动为实例,论述了如何应用FOG的方法提高生产线平衡率的问题.
Abstract:In engineering, Line Balancing Rate is the quota that measures the average situation of every cycle time in working procedure and the production efficiency on processing line. FOG activities are an effective measrue in solving the problem of Line Balancing. The writer cites instances of KC6 Cam Shaft Line and illustrates how to apply FOG method to increase Line Balancing Rate.
keywords: IE on site FOG activities line balancing rate
文章编号:20040212 中图分类号: 文献标志码:
基金项目:
Author Name | Affiliation |
WU Jie-ming | Wuyang-Honda Motors (Guangzhou) Co. Ltd., Guangzhou 510260, China |
引用文本:
吴杰明.应用FOG方法提高生产线平衡率浅析[J].上海电力大学学报,2004,20(2):49-53.
WU Jie-ming.Increasing Line Balancing Rate by Applying FOG Method[J].Journal of Shanghai University of Electric Power,2004,20(2):49-53.
吴杰明.应用FOG方法提高生产线平衡率浅析[J].上海电力大学学报,2004,20(2):49-53.
WU Jie-ming.Increasing Line Balancing Rate by Applying FOG Method[J].Journal of Shanghai University of Electric Power,2004,20(2):49-53.