本文已被:浏览 853次 下载 487次
投稿时间:2006-08-24
投稿时间:2006-08-24
中文摘要: 从论述加速煤电烟气脱硫步伐的紧迫性出发,分析了煤电脱硫工程产业化中的几个问题,并阐述了国家加大支持煤电脱硫力度的必要性和可行性.
Abstract:From the necessity and pressure of quickening the pace of gas desulfurization in thermal power plants, some problems in the trend towads market of the desulfurization project in thermal power plants is analyzed, illustrating the necessity and pressure for the government to enhance its support for the project of gas desulfurization in thermal power plants.
文章编号:20070115 中图分类号: 文献标志码:
基金项目:
作者 | 单位 |
黄琳 | 国电谏壁电厂, 江苏 镇江 212006 |
周翔 | 国电谏壁电厂, 江苏 镇江 212006 |
Author Name | Affiliation |
HUANG Lin | Jianbi Power Plant,State Power Corporation,ZhenJiang 212006,China |
ZHOU Xinag | Jianbi Power Plant,State Power Corporation,ZhenJiang 212006,China |
引用文本:
黄琳,周翔.当前煤电厂烟气脱硫中的几个问题[J].上海电力大学学报,2007,23(1):57-60.
HUANG Lin,ZHOU Xinag.Some Problems in the Gas Desulfurization in Thermal Power Plants[J].Journal of Shanghai University of Electric Power,2007,23(1):57-60.
黄琳,周翔.当前煤电厂烟气脱硫中的几个问题[J].上海电力大学学报,2007,23(1):57-60.
HUANG Lin,ZHOU Xinag.Some Problems in the Gas Desulfurization in Thermal Power Plants[J].Journal of Shanghai University of Electric Power,2007,23(1):57-60.