中文摘要: 为了研究1 000 MW机组变频发电机项目的热经济性,拟定了安徽某电厂1 000 MW机组的变频发电机项目方案.运用定流量分析法发现,采用变频发电机后机组上网净功率减少,这说明理论供电标准煤耗将有所上升,项目的热经济性实际上是负收益,因此给出了缓建变频发电机项目的建议.
Abstract:In order to study the thermal economy of unit project of 1000 MW variable frequency generator, the scheme of 1000 MW variable frequency generator project of Anhui 1000 MW power plant is first planned, and the constant flow analysis method is used. It is found that Internet unit net work reduces after using the variable frequency generator, which illustrates that in theory the power supply standard coal consumption will rise. The thermal econmy of the project is in fact the negative earnings and it is thus suggested that the coustruction of the variable frequency generator program be postponed.
文章编号:20140409 中图分类号: 文献标志码:
基金项目:
引用文本:
付昱,吴志祥,郝伟阳.1000MW机组变频发电机项目热经济性分析[J].上海电力大学学报,2014,30(4):333-338,351.
FU Yu,WU Zhixiang,HAO Weiyang.Thermal Economic Analysis of 1 000 MW Unit Frequency Generator[J].Journal of Shanghai University of Electric Power,2014,30(4):333-338,351.
付昱,吴志祥,郝伟阳.1000MW机组变频发电机项目热经济性分析[J].上海电力大学学报,2014,30(4):333-338,351.
FU Yu,WU Zhixiang,HAO Weiyang.Thermal Economic Analysis of 1 000 MW Unit Frequency Generator[J].Journal of Shanghai University of Electric Power,2014,30(4):333-338,351.