中文摘要: 结合安徽某电厂二期扩建2×1000 MW工程,在常规汽轮车回热系统和锅炉烟风系统设计基础上,提出了低温省煤器项目设计的具体方案,分析了低温省煤器项目在1000 MW机组上应用的技术经济性,并研究了该项目的可行性。
Abstract:In combination with the expansion project of the 2×1000 MW of a certain peower plant in Anhui Province, on the basis of the design of heat recycle system of conventional turbine and the boiler smoke venture system, a specific design of the low temperature economizer program is proposed, and the technically economical features of the application of the low temperature economizer in the 1000 MW unit program are analyzed.