本文已被:浏览 908次 下载 625次
Received:September 30, 2014
Received:September 30, 2014
中文摘要: 在国内常规火力发电项目建设与运营过程中的工程数据与资料管理通常存在着工程设计期无法实时获取设计进度、无法进行有效的数据整合和管理等问题.为有效解决上述问题,在山东莱州电厂一期工程建设过程中,建设单位提出了在全厂范围内采用三维数字化技术,利用计算机技术来解决设计、施工、运营过程中的问题,并获得了成功应用,建设了首家"数字化"电厂.主要论述了该技术在山东莱州电厂的应用情况及存在的主要问题,并提出了解决问题的对策.
Abstract:In the course of construction and operation of the conventional coal-fired power plants in China, in terms of project data and statistics management, there exist such problems as inability to obtain information of the process of the project, inability to effectively integrate various data and coordinate management.In order to solve the above-mentioned problems, in the construction of Project I of Laizhou Power Generation Co.Ltd., it is proposed by the construction party that three-dimensional digital technology be used throughout the plant, computerizing designing, construction, operation.The proposal was adopted, resulting in the first digitalized power plant.The problems in the application of Laizhou Power Generation Co., Ltd.are discussed and some counter-measures to them are offered.
文章编号:20140511 中图分类号: 文献标志码:
基金项目:
Reference text: