###
上海电力大学学报:2022,38(3):234-238
本文二维码信息
码上扫一扫!
双进双出磨煤机入炉煤量折算算法
(上海电力建设启动调整试验所有限公司)
Conversion Algorithm of Coal Quantity in Double Inlet and Double Outlet Coal Mill
(Shanghai Electric Power Construction Start-Up Adjustment Test Institute Co., Ltd., Shanghai 200030, China)
摘要
图/表
参考文献
本刊相似文献
All Journals 相似文献
All Journals 引证文献
本文已被:浏览 601次   下载 360
投稿时间:2022-03-18    
中文摘要: 为了准确计量入炉瞬时煤量,提出了一种双进双出磨煤机精确计量入炉瞬时煤量算法,并以山西盂县裕光发电厂2×1 000 MW工程项目为实例进行实验。实验结果表明:采用精确计量入炉瞬时煤量折算算法负荷变化较小,且主蒸汽压力处于安全运行范围,满足机组协调控制正常投入所需的煤量测量准确的基本条件,对于双进双出磨煤机,更易实现电网负荷调峰。
Abstract:In order to accurately measure the instantaneous coal amount into the furnace,an algorithm for accurate metering of the instantaneous coal amount into the furnace is proposed for a double-in and double-out coal mill,and the experiment is carried out with the 2×1 000 MW of Yuguang Power Plant in Yuxian County,Shanxi Province as an example.The experimental results show that the conversion algorithm of the instantaneous coal quantity that is accurately metered into the furnace is adopted,the load change is small to meet the speed and accuracy requirements of the power grid,and the main steam pressure is within the allowable range during safe operation,which can meet the coal quantity measurement required for the unit to coordinate and control the normal input.It is easier to achieve grid load peak regulation for double-in and double-out coal coal mill.
文章编号:20223005     中图分类号:TK474    文献标志码:
基金项目:
引用文本:
叶祺贤,陆梁.双进双出磨煤机入炉煤量折算算法[J].上海电力大学学报,2022,38(3):234-238.
YE Qixian,LU Liang.Conversion Algorithm of Coal Quantity in Double Inlet and Double Outlet Coal Mill[J].Journal of Shanghai University of Electric Power,2022,38(3):234-238.