###
DOI:
Journal of ShangHai University of Electric Power :1997,13(3):70-74
View/Add Comment     Archive    Advanced search     HTML
←Previous   |   Next
湖州电网电力电量预测
(湖州电力局)
Estimation of Huzhou Electric Power System
(Huzhou Electric Power Bureau)
Abstract
Image-text
References
Similar literature
本文已被:浏览 1199次   下载 588
Received:June 24, 1997    
中文摘要: 本文根据湖州市地方国民经济和社会发展情况,采用电力弹性系数法、数学回归分析法、新增投资用电量法和GDP单耗法等4种方法,对湖州电网负荷电量进行了中长期预测.预测结果较为接近,可作为电网中长期规划设计的重要依据.
中文关键词: 电网  负荷电量  预测
Abstract:In this paper, electric coefficient method, mathematical analysis method, new investment power cost method, and GDP cost method are used to estimate the power load of the electric network of Huzhou for a mid-long term, based on the analysis for the development of the economy and society condition of Huzhou. The four results are close to each other, and can be used as an important reference for mid -long term plans of electric networks.
文章编号:19970312     中图分类号:    文献标志码:
基金项目:
Author NameAffiliation
Shan Ren Huzhou Electric Power Bureau 
Author NameAffiliation
Shan Ren Huzhou Electric Power Bureau 
Reference text: